Case Number 11391
Request Date 20/10/2025
Completion Date 28/11/2025

 

Details of the Request

1. Name of NHS Trust / Foundation Trust:

 

2. Has your organisation reviewed NHS Estates Technical Bulletin 2024/3 with the specific note on non-tuberculous mycobacteria? (Yes/No)

  • Yes
  • No

 

3. Does your organisation treat any of the “high-risk” patient groups listed in the NHS Estates Technical Bulletin 2024/3? Select all that apply.

  • Lung and/or heart transplant
  • Cystic fibrosis
  • Haematology / oncology patients with neutropenia,
  • CAR-T cell patients
  • Other solid organ transplant,
  • Patients with long-term lines

 

4. Do you have a Water Safety Group or equivalent multidisciplinary body for any water-related issues? (Yes/No).

  • Yes
  • No

 

5. Do you currently conduct routine environmental water testing for NTM? (Yes/No). If yes, please state the areas tested and the frequency of testing.

  • Yes
  • No

 

6. Does your Water Safety Plan include specific controls for NTM, separate from general Legionella / Pseudomonas measures? (Yes/No) - If yes, please specify.

  • Yes
  • No

 

7. If NTM testing is undertaken, which laboratory / method is used, and is it UKAS-accredited to ISO 17025 for NTM testing or according to the methods suggested in the bulletin?

 

8. If you have tested, have you detected NTM in water samples from patient care areas in the last 3 years? (Yes/No; if yes, please indicate the area(s) and summarise the control measures taken).

  • Yes
  • No

 

9. Which control and / or remedial measures are you currently using to manage waterborne pathogens in your organisation? Select all that apply

  • Point-of-use filters
  • Temperature controls
  • Chemical controls (any, i.e. chlorine, silver-copper ionization)
  • Pipe removal work (including new copper pipes)
  • Descaling and cleaning of water outlets
  • Complete removal of outlets/sink
  • Other (please list below)

 

10. In the last 5 years, have you made any design changes in high-risk areas specifically to reduce waterborne infection risk (e.g., removal or relocation of sinks, drainage modifications, point-of-entry filtration)? (Yes/No; please provide brief examples).

  • Yes
  • No

 

11. Are you planning any major refurbishment in the next 5 years and/or is your organization part of the NHS New Hospital Programme? (Select all that apply)

  • Yes - Planning Refurbishment Works
  • Yes - part of the NHS New Hospital Programme
  • No - neither

 

Details of the Response

1. Name of NHS Trust / Foundation Trust:

Ashford and St Peter’s NHS Foundation Trust

 

2. Has your organisation reviewed NHS Estates Technical Bulletin 2024/3 with the specific note on non-tuberculous mycobacteria?

No

 

3. Does your organisation treat any of the “high-risk” patient groups listed in the NHS Estates Technical Bulletin 2024/3?

 

4. Do you have a Water Safety Group or equivalent multidisciplinary body for any water-related issues?

Yes - Water Safety Group

 

5. Do you currently conduct routine environmental water testing for NTM?

No

 

6. Does your Water Safety Plan include specific controls for NTM, separate from general Legionella / Pseudomonas measures?

No

 

If NTM testing is undertaken, which laboratory / method is used, and is it UKAS-accredited to ISO 17025 for NTM testing or according to the methods suggested in the bulletin? 

N/A - No Testing Undertaken

 

8. If you have tested, have you detected NTM in water samples from patient care areas in the last 3 years?

N/A (Have not Tested for NTM)

 

9. Which control and / or remedial measures are you currently using to manage waterborne pathogens in your organisation? 

All of the above, plus TMV& TNT maintenance, Sampling and testing of all outlets on Bi-annually on a rolling cycle.

 

10. In the last 5 years, have you made any design changes in high-risk areas specifically to reduce waterborne infection risk (e.g., removal or relocation of sinks, drainage modifications, point-of-entry filtration)?

Yes - Removal or relocation of sinks, removal of dead legs, taps & basins, maintenance of TMVs &TNTs and capital planned works.

 

11. Are you planning any major refurbishment in the next 5 years and/or is your organization part of the NHS New Hospital Programme?

Yes - Planning Refurbishment Works

 

 

Protecting Your Online Privacy
Protecting Your Online Privacy

This Ashford and St Peter's website uses cookies to track visitor numbers. Find out more in our Cookies Policy and Privacy Policy. You can also read our Accessibility Statement and Privacy Notice for your information.